James River Bridge Closure 2024 Schedule

0 Comments

James River Bridge Closure 2024 Schedule. The james river bridge (jrb) wire rope replacement project replaced the 80 counterweight wire ropes, necessary to lift the bridge span for marine traffic, that are housed in. 16 at 5 a.m., the route 17 james river bridge (jrb).


James River Bridge Closure 2024 Schedule

Closure dates announced please see the dates below for the james river bridge wire rope replacement in january and february 2024. Newport news/isle of wight county — the contractor for the virginia department of transportation’s (vdot) james river bridge wire ropes replacement project.

James River Bridge Closure 2024 Schedule Images References :

Related Posts